|
| The Allan 2-Row Harvester gets ready to begin digging another drill. It's windrowers have already dug the row alongside, and placed them in the drill ahead of the harvester. This way, the 2-row harvester is able to pick up 8 rows per pass. | 1/7/04 12:00 AM |
| Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | | |
![]() |
| Generated by JAlbum 6.1 | Chameleon skin by LazaDezign |